PROJECT:
P-1908 Aircraft Hangars and Administrative Building
P-1908 was located on the same construction site as P-1900 with the same general contractor, Hensel Phelps.
Hangar 1: 688 tons of seismic reinforced steel
Notable: 395’ clear span streel truss – second longest in the world
• Extensive design-build BIM coordination was conducted by Agate Steel and the Exact Detailing teams to ensure adherence to project specifications and safe, efficient installation of the extensive steel truss.
• IFC models were utilized as reference points for subsequent trades, including Agate Steel’s erection partner, LPR Construction, for a full, structural engineering stamped erection plan.
• This approach with LPR construction allowed for the identification and resolution of conflicts and clashes to enable an efficient installation of the world’ second longest span steel truss at 395 feet.
Overall, the P-1908 project exemplifies Agate Steel’s commitment to proactive & creative planning to perform some of the most complex structural steel scopes to date.